400 kW ultra fast EV charging, Dunsborough
400 kW ultra fast EV charging, Dunsborough
All projects

Retail / EV

400 kW ultra fast EV charging, Dunsborough

Ultra fast 400 kW EV charging that can charge four vehicles at once, running mostly on the centre’s own solar.

The challenge

What they needed

The shopping centre wanted a state of the art EV charging hub that ran on clean energy, enhanced the retail experience and created a new revenue stream.

What we did

The solution

We delivered two 200 kW Blueberry Plus chargers (400 kW total, four vehicles at once, each CCS2 cable rated to 350 kW) with dynamic load management and advertising displays, integrated with the existing 440 kW rooftop and carport solar we installed in 2019.

Blueberry

Why it matters

Key highlights

  • We installed the centre’s original 440 kW solar system back in 2019, so this builds on an existing relationship.
  • Digital displays on the chargers double as on site advertising for the centre.
  • Dynamic load management and OCPP integration built in for reliable operation.
  • Each charger’s CCS2 cable is rated to 350 kW, among the fastest available.

On site

The install

400 kW ultra fast EV charging, Dunsborough, install photo 1
400 kW ultra fast EV charging, Dunsborough, install photo 2
400 kW ultra fast EV charging, Dunsborough, install photo 3
400 kW ultra fast EV charging, Dunsborough, install photo 4
400 kW ultra fast EV charging, Dunsborough, install photo 5
400 kW ultra fast EV charging, Dunsborough, install photo 6

Have a site in mind?

Tell us about your site and our team will come back within one business day.

Request a proposal