400 kW ultra fast EV charging, Dunsborough
Ultra fast 400 kW EV charging that can charge four vehicles at once, running mostly on the centre’s own solar.
The challenge
What they needed
The shopping centre wanted a state of the art EV charging hub that ran on clean energy, enhanced the retail experience and created a new revenue stream.
What we did
The solution
We delivered two 200 kW Blueberry Plus chargers (400 kW total, four vehicles at once, each CCS2 cable rated to 350 kW) with dynamic load management and advertising displays, integrated with the existing 440 kW rooftop and carport solar we installed in 2019.
Blueberry
Why it matters
Key highlights
- We installed the centre’s original 440 kW solar system back in 2019, so this builds on an existing relationship.
- Digital displays on the chargers double as on site advertising for the centre.
- Dynamic load management and OCPP integration built in for reliable operation.
- Each charger’s CCS2 cable is rated to 350 kW, among the fastest available.